CONNECTION PROCEDURE - DOMESTIC (A1),
COMMERCIAL (A2), INDUSTRIAL (B1, B2) & OTHERS

DOCUMENTS REQUIRED

  1. Application Form
  2. Abridged Conditions of Supply
  3. Attested Copy of National Identity Card of Applicant
  4. Attested Copy of National Identity Card of witness
  5. Attested Copy of Property Ownership
  6. NOC from Owner in case of Tenant

ADDITIONAL DOCUMENTS FOR INDUSTRIAL CONNECTIONS (FOR LIMITED COMPANIES)

  1. Resolution from Board of Directors in Favor of Signatory
  2. Certified True Copy of Memorandum of Articles of Association
  3. Certified True Copy of Form-29

ESTIMATED TIME SCHEDULE (FOR B1 AND B2 CONNECTIONS)

Sr. #

Activity/Details

Days

PHASE 1

1

Registration

1

2

Survey & Estimation

2

3

Demand Notice (DN) of Capital/Security

7

PHASE TIME

10

PHASE 2 - After payment of DN and Test Report (where required)

1

Wiring Test Report Verification

5

2

Service Connection Order(SCO)/Material Release Order(RO)

2

3

Energization of Connection

10

PHASE TIME

17

TOTAL CONNECTION TIME

27


(Time taken by applicant for payment of DN excluded)

PROCEDURAL MECHANISM

    • The DN can be collected by the applicant on specific date given on the receipt of application from concerned office, otherwise it will be dispatched through post.
    • Payment of DN is to be made in the designated bank/branch.
    • Test Report is to be submitted alongwith the payment of security in the bank.
    • Test report shall be verified by concerned office.
    • Release Order will be issued by Sanctioning Authority along with SCO.

     

 
Downloads Services Investor Info Useful links
Connection Procedure
Application Form
Installment Power
Detection Bill Policy
Electricity Tariff
Customer Service Center
Complaint System Info
Online Billing
Incentive Packages

Contact us
Tender Notice
Registered Supplier Registered Contractor
Registration Process
Ministry of Water & Power
PEPCO
PESCO
NEPRA
PPRA
TESCO Dashboard
       

 

 
 
 
 
 
 
 
 
 

 

 
 
 
             
Copy rights 2013 all rights reserved